Use 5 to 7 st Riprap is a permanent layer of large, angular stone, cobbles, or boulders typically used to armor, stabilize, and protect the soil surface against erosion and scour in areas of concentrated flow or wave energy. Geotextiles. 1 0 obj cIP=L
?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam
-j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF Mirafi N-Series Product Description Sheet. Weight will vary based on density of rock available for the project. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. 2 0 obj %PDF-1.3
%
To better control the contractors selection of rocks for placing, ensure the contractor paints tonnage on large rocks used in foundation construction. requirements. are available to meet BABA (Build America, Buy America) requirements. Review contractors verification of unit weight of rock-filled gabions. To provide the desired cleanliness, the contractor may need to sluice the rock or facing. Use all suitable material in the work. RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. 0000008354 00000 n
For maximum effect, both components must be integrally planned prior to road construction. Source: Caltran Highway Design Manual, Chapter 870 0000013368 00000 n
Soil Stabilization Matting - Slope Application, Perm. Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. stream Rock riprap consists of loose rock that is dumped on the slope and distributed. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. Note any changes that may have occurred between the preliminary design studies and the start of construction. main search page where you can specify additional parameters. << When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. This information is to be used only as a guide. Copyright Maryland.gov. When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. Slope protection is usually needed to protect the upstream slope against erosion due to wave action. Obtain rock samples for acceptance tests. These products were developed to meet specific agency (DOTs, MTOs, etc.) Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. ), Geocomposite Wall Drain (w/ 6oz on 1 or 2 sides - Please specify.). <> XYo[unHCih,(~
t@K{
y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H
/$Q-Aav. 0000011079 00000 n
Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. Nominal RSP class by median particle diameterb Nominal median Ensure that the contractor performs concrete finishing as specified and that the slope paving is cured by one of the specified methods. Temp. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. <> . The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. All items. Temporary structures shall be left in place until adequate vegetation and the permanent . 2019-07-30T13:47:33-04:00 endobj When slope paving with concrete pavers is specified, ensure the special provision requirements are met. <>/Font<>>>/Fields[]>> conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. Rock Slope Armor is a layer of rock, such as ditch lining rock, cobble rock, concrete rubble, or riprap, which is hand or mechanically placed on an erodible soil slope. DM[2TI=lGQx7
UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F)
RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. Mirafi N-Series nonwovens combine high water flow rates, high soil interaction and durability while providing excellent soil particle retention. Check to ensure that slopes and foundation areas are graded and compacted to specified tolerances. Rock Slope Protection Fabric, used in slope stabilization projects (see Technical Note on Rock Slope Protection / Rip Rap) When required by the Project Engineer, a Certificate of Compliance for each type of fabric being used should be issued by the supplier and furnished to the Engineer. You may check the size of rock by roughly measuring the size and converting the volume to mass. They are designed to protect against raveling-type rockfall that involves small-volume slope failures (up to about 7.6 m3 or 10 yd3) or blocks up to 1.5 m (5 ft), depending on the strength of the mesh used (Muhunthan et al. Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. 0000002021 00000 n
Use the size and composition of yarn that is recommended by the fabric manufacturer. Rock Channel Protection Paved Gutter 601.13 Basis of Payment 601.01 Description. 2. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. >> When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. 8 0 obj Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. trailer
<<
/Size 489
/Info 438 0 R
/Root 464 0 R
/Prev 989742
/ID[<23d8c9b814a334ef8bf252da6b923edc><23d8c9b814a334ef8bf252da6b923edc>]
>>
startxref
0
%%EOF
464 0 obj
<<
/Pages 445 0 R
/Type /Catalog
>>
endobj
487 0 obj
<< /S 1440 /Filter /FlateDecode /Length 488 0 R >>
stream
0000015681 00000 n
Protection involves constructing a heavy mass of smaller rocks bound together by concrete. When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. Order corrective work when necessary. {s9y^ L Earth Compacted Fabric Engineering 6'' 1'-0'' centers Staples at 6'' 2'' 6'' (Rock Splash Basin) TYPE 4 1 2 (Rock Slope Protection) TYPE 5 Staples at 12 inch centers. EZw5'dr=`j+2\8:U.|V,%)~h/X8ps Verify the types of measurements and records necessary to support payment for the work. This handbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by working with our customers to provide advanced solutions. :t4NV]j{/mtqF*sx[%M
5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek 0000014231 00000 n
Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. There are three material gradation requirements based on required rock layer thicknesses. 2005), although maintenance considerations may serve to reduce this maximum size. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0
0=F5VvL(^f <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> If the slope is steeper than 2:1, do not use rounded boulders and cobbles. When placing rocks, the contractor should ensure each placed rock is stable and not dependent on the one on top to hold it in place. The Maryland General Assemblys Office of Legislative Audits operates a toll-free fraud hotline to receive allegations of fraud and/or abuse of State government resources. At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. There are three material gradation requirements based on required rock layer thicknesses. <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> Erosion Control Blankets Wattles help slow water runoff and reduce soil erosion. The chart below lists US Fabrics' geosynthetics meeting CALTRANS specifications. Angular shaped rock may be used on any planned slope. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. KEwAx{N*$J
}COpU?s{bs. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. Ensure concrete is cured by one of the specified methods. Test panels may be specified in the special provisions. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. 0000013346 00000 n
4 0 obj Fabric used for rock slope protection, temporary construction roadways, separation, stabilization, reinforcement, drainage, and erosion control. Click on the to search for an item in When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. Soil Stabilization Matting - Channel Application, Temp. construction contract standards page. Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. The gabions are placed on filter fabric as detailed in the plans and specifications. Fabric must be RSP fabric that complies with the class shown in the following table: Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these. Intermittent inspection of placement of slope protection, slope paving, and fabric operations. Ensure that rocks of the specified sizes and shapes are being used. More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! Please enable scripts and reload this page. | Conditions of Use | Privacy Policy +NXR!ft]l|\P2. Lap 6'' min. Geosynthetic Bond Breaker (Call for product. =w
(j($M/!bMbo,iDjQL1{L! It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. Barrier Landscape Edging & Paver Edging 6'/8. Review Section 4-90, Concrete, of this manual for details about concrete production. Ensure the equipment used during spreading does not crack the rock. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. 0000000871 00000 n
endobj /Length 5601 com routes make excellent running trails for serious runners and casual joggers, alike. If the fabric is joined by stitched seams, stitch with contrasting colored yarn. 463 0 obj
<<
/Linearized 1
/O 465
/H [ 928 1116 ]
/L 999132
/E 15929
/N 109
/T 989753
>>
endobj
xref
463 26
0000000016 00000 n
2019-07-30T13:47:33-04:00 Riprap is typically placed along graded ditch, channel, and shoreline banks over geotextile, which prevents erosional undercutting. Erosion control devices provide direct protection to the soil surface therefore, are considered one the best measures for preventing erosion. These products can be used in areas where they meet the local agency requirements. In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. Class E Revetment Erosion Stone or Class E Revetment Erosion Stone or A A Engineering Fabric Ditch Bottom 2' 2' Anchor Slot W 6'' min. The devices include ground covers and channel liners such as: 1. 0000009682 00000 n
The contractor must also ensure the construction of adequate returns and keys at the ends. 1, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. All rights reserved. 2 0 obj The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. Method B is not restrictive with respect to the placement of individual rocks. Decide whether an adequate number has been provided for the particular installation. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. Placement of Bedding Material 1. << GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28
1}9AQ #T6Bc*)_vU"]T hY# rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) 6'' min. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. /OPM 1 For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. The maximum height of the vertica l lower portions 3.5 feet. Smooth the graded foundation. Broken-concrete slope protection consists of placing broken concrete from job site locations identified within the contract. { , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. <>stream Review the plans for the location and number of weep holes. Information reported to the hotline in the past has helped to eliminate certain fraudulent activities and protect State resources. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. 0000002336 00000 n
In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. BMP040 "rock slope protection (no fabric)" as applicable. % The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. At TenCate ourgoal is your success. 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS Roll size is 15'x300 Equivalent to Mirafi 1120NC or Skaps GT112 (Click here for spec) When slope protection is paid by weight, refer to the discussion of weighing and metering procedures in Section 3-902E, Weighing Equipment and Procedures, of this manual. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. State-furnished materials and expenses, as well as supplemental work items and descriptions. engineering fabric pinned to the slope, or both a . 1. Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. The samples will be crushed in the laboratory to sizes needed to perform tests. If the rock layer is shown as 7 inches thick, comply with grading shown in the following table: If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table: If the rock layer is shown as 4-inches thick, comply with grading shown in the following table: Granular material must contain at least 90 percent crushed particles when tested under California Test 205. Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. endobj To respond to the different problems associated with instability of rock faces, Geofabrics also has a broad range of independently verified rockfall mitigation systems. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . Enter the item description of the code you wish to search for: AASHTO is typical mass of 4.1 sy/oz. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.